Case Study - Townsville Hospital Qld

Following the 2009 State election, funding was allocated to the Townsville Hospital Redevelopment. $25 million was committed to fit out Level 2 of the Emergency Department and to refurbish associated areas within the existing Acute Care building


Townsville Hospital (Qld)

Architect & Hydraulic Consultant:

Cox Rainer; McKendry Rein and Peterson

Description:

Following the 2009 State election, funding was allocated to the Townsville Hospital Redevelopment. $25 million was committed to fit out Level 2 of the Emergency Department and to refurbish associated areas within the existing Acute Care building specifically for an expanded NICU facility taking the total to 50 Level 2 and Level 3 cots. .

Products Specified and Installed: Flowmatic® Electronic Tapware, and CliniLever® Tapware


Leave a comment


Comments have to be approved before showing up